Environmental Agency Regulations Replacement Tank in Haigh

We updated a Septic Tank to a Sewage Treatment Plant due to the old tank discharging into a watercourse, therefore not complying with the new Environmental Agency Regulations. This installation was a little tricky due to poor access. The job location was in Haigh, near Wigan.

Septic Tank Replacement in Rufford

A non-compliant septic tank replacement in Rufford, near Burscough. This sewage treatment plant installation was on unstable ground due to a high water table. PJC Groundworks invests in specialist equipment to work safely and complete installations, regardless of ground conditions, location, or depth, preventing hidden extra costs due to unforeseen conditions.        Continue Reading

Sewage Treatment Plant – Rainford

We have recently replaced an old brick-built system, which was beyond repair and didn’t comply with the new environmental regulations, with a new Sewage treatment plant. The tank is now fully compliant. Contact us with your wastewater treatment requirements.

Sewage Treatment Plant Installation – Lathom

Even with tricky ground conditions, with running sand and unstable ground, we ensured that this treatment plant was fitted safely and securely. PJC Groundworks cater for all types of tank installations and has the right equipment and experience to make an installation run smoothly. Lathom – 2025

Updated Tank Installation – Lathom

Due to an old system failure and non-compliance with Environmental Agency Regulations, we were called to replace the old Septic Tank with a new treatment plant that would comply. We specialise in all wastewater problems, always finding the best solution from design to completion! Lathom – March 2025

Tank Regulations – Ormskirk

We had a customer with an old brick-built Septic Tank System that was not compliant with the Environment Agency Regulations. To ensure that the tank complies with the new Regulations, we installed a Sewage Treatment Plant. Ormskirk – July 2025  

Sewage Treatment Plant – Chorley

We have installed a new Sewage Treatment Plant as the old Septic Tank was beyond repair, and also discharged into a watercourse. Chorley – June 2025  

Septic Tank Replacement – Mawdesley

We have fitted a Septic Tank replacement, due to the existing system failing and taking groundwater in. The solution for this was to install a new Sewage Treatment Plant and divert inlet drainage to it, and connect to the existing outlet. Mawdesley near Chorley – March 2024

Septic Tank Upgrade – Halsall

We were asked to upgrade a Septic Tank for a house renovation in Halsall. We fitted a Klargester boar 1, to accommodate the property occupants. Halsall – March 2024  

Wastewater Solution – Euxton

We managed to use the old Septic Tank and put the new Treatment Plant inside it. We always find the right wastewater solution, no matter on the access, ground conditions, or drainage diversions. Septic Tank upgrade – Euxton in Chorley May 2023