Updated Tank Installation – Lathom
Due to an old system failure and non-compliance with Environmental Agency Regulations, we were called to replace the old Septic Tank with a new treatment plant that would comply. We specialise in all wastewater problems, always finding the best solution from design to completion! Lathom – March 2025
Sewage Treatment Plant – Chorley
We have installed a new Sewage Treatment Plant as the old Septic Tank was beyond repair, and also discharged into a watercourse. Chorley – June 2025
Septic Tank Upgrade – Lathom
The customer’s tank was discharging into a ditch at the rear of their house, which we needed to amend to ensure that it was compliant with new Environment Agency regulations. There was no access for machines, so we decided to use the old tank to accommodate a new system, with a bit of demolition theContinue Reading
Sewage Treatment Plant – Burscough
Septic Tank upgraded in Burscough, to a new Sewage Treatment Plant. The old Septic Tank discharged into a culvert so needed replacing to comply with Environmental Agency regulations. May 2023
Replacement Sewage Treatment Plant – Wrightington
Brand New Sewage Treatment Plant installation in Wrightington, near Chorley. This property already had a Sewage Treatment Plant, however, the poor design of the installation caused it to fail and so another treatment plant had to be installed to accommodate a new garage annex.
Sewage Treatment Plant & New Drainage – Leyland
Brand new Sewage Treatment Plant & drainage system fitted in Leyland. PJC Groundworks specialise in all drainage and wastewater solutions, give us a call for a quick quote.
Sewage Treatment Plant – Lathom
Marsh Ensign Sewage Treatment Plant installation in Lathom, near Ormskirk. This tank was fitted due to an existing outlet entering a watercourse.
Septic Tank Upgrade – Ormskirk
Septic Tank Upgrade; This sewage treatment plant install was needed because the old brick tank didn’t comply with new regs as it ran to a ditch. Tank Location: Ormskirk
Septic Tank Upgrade – Ashton
This installation was a little different as we adjusted the existing septic tank (demolishing internal walls and breaking the septic tank floor out to suit our new system). Installation was completed in 2 days, including the diversion of rainwater from the foul line. Tank Location Ashton near St Helens.
Soakaway – Halsall
Septic Tank Soakaway – here we have an installation of pumped high-level soakaway due to the existing outlet being clogged and beyond repair. Tank Repair Location: Halsall near Melling.
